Implementation Project Of The Third Part Of The Main Drainage Line From The Intersection
20 August، 2024Tunnel Push Runner, Diameter 1.80, Under A New Road And Railway
27 August، 2024
A Project To Double The Water Line From The Stacking Riser To The Networks Of The Administrative Capital – Additional Works – Construction Of A Runner With A 2500 Mm Diameter Tunnel Under South Al Mostakbal Road.
-
A project to double the water line from the stacking riser to the networks of the Administrative Capital – Additional works – Construction of a runner with a 2500 mm diameter tunnel under South Al Mostakbal Road.
Giza Contracting Company is the main client for the Aleya project and the owner of the Executive Authority for Drinking Water and Sanitation.
The company’s tendency