أصبحت الشركة رائدة فى مجال الأنفاق بمختلف أنواعها سواء كان ذلك فى الأنفاق تحت الطلرق والسكك الحديدية
تليفون: 27546709
Home
About Us
Our Projects
Projects That Were Implemented And Delivered Initially And Finally
Some Projects Are Under Implementation
Contact Us
English
العربية
✕
Sanitation project for the village of Al-Qalaj – Al-Marj – Qalyubia
A 2.5m tunnel under the Katameya-Ain Sokhna road
20 August، 2024
Implementation Project Of The Third Part Of The Main Drainage Line From The Intersection
20 August، 2024
Tunnel runners with a diameter of 1200 mm under the railway and under the Belbeis Covered Drain.
Affiliated to Al-Amana General Contracting Company and the owner (executive body).
Share
3hand
Related posts
27 August، 2024
A tunnel runner with a diameter of 2.25 m below the ocean drain
Read more
27 August، 2024
Tunnel Push Runner, Diameter 1.80, Under A New Road And Railway
Read more
20 August، 2024
A Project To Double The Water Line From The Stacking Riser To The Networks
Read more
English
العربية
English
أصبحت الشركة رائدة فى مجال الأنفاق بمختلف أنواعها سواء كان ذلك فى الأنفاق تحت الطلرق والسكك الحديدية
تليفون: 27546709